Weekly Construction Update May 20

UDOT

Iron County

S.R. 130 North Cedar Main Street

Contract: Intermountain Slurry Seal

Amount: $181,181

Location: Nichols Canyon Drive to Maxwell Road

Impact: * This will be a moving operation but temporarily impact some accesses.

* Ramps at the Enoch/Minersville Exit 62 will temporarily shut down as the operation passes over the structure.  Local traffic may want to consider alternate routes for convenience.

Activity: * Applying a slurry seal coat Wednesday and Thursday

* Painting is anticipated Thursday.

 

Washington County

I-15, Black Ridge to the Iron County Line

Contract: W.W. Clyde & Co.

Amount: $17,338,995

Location: Between the Toquerville and New Harmony exits.

Impact: * Single lane closures both directions at the New Harmony exit.

* Lane shifts to accommodate paving and grading.

Activity: * Bridge deck repairs at Exit 42.

* Excavation and ramp work near Exit 36.

* Paving inside northbound lane from mileposts 34 to 37.

* Sub-grade work on the northbound outside lane.

* Northbound retaining wall construction.

* Placing pre-cast barrier.

 

I-15, Dixie Drive Interchange

Contract: Washington County Constructors

Amount: $52,549,452

Location: St. George (Mileposts 5 – 6)

Impact: * Two lanes of traffic remain open in both directions.

* All exits are open.

* Speed is reduced to 55 m.p.h.

* Northbound traffic has been shifted to the southbound side of the interstate near the Santa Clara bridge.

* Motorists should use caution near the Bluff Street Interchange merge lanes.

* Traffic lanes have been shifted on Hilton Drive.

* The Hilton Drive Trail is closed.

Activity: * Pouring concrete.

* Paving.

* Retention walls west of I-15 and also under the Bluff Street Interchange.

* Structural preparation for the future southbound on-ramp.

* Drainage work at Hilton Drive.

* Flood debris removal and dredging.

http://www.udot.utah.gov/i15dixie/

S.R. 212, Telegraph Street

Contract: Interstate Rock Products

Amount: $5,515,140

Location: City of Washington, 500 West to 300 East

Impact: * Traffic lanes weave through the project.

* Reduced speeds.

* One lane of traffic in each direction.

* Sidewalk closures.

Activity: * Storm drain installation.

* Road widening.

* Retaining wall installation near 400 West.

* Utility work and landscaping.

 

S.R. 59, Arizona State Line to Apple Valley

Contract: A-T Asphalt Paving

Amount: $1,998,101

Location: Mileposts 0 to 11

Impact: * Oversized loads restricted.

* Pilot car operations with delays of up to 15 minutes.

Activity: Setting up traffic control and project equipment.

 

S.R. 9, 300 West To 800 North Hurricane

Contract: Interstate Rock Products

Amount: $10,203,871

Location: Hurricane City State Street

Impact: Expect single lane closures.

Activity: * Paving side streets.

* Painting stripes.

 

Southern Parkway Advanced Traffic Management

Contract: Transcore ITS

Amount: $370,674

Location: S.R. 7 Mileposts 0 to 7

Impact: No traffic impacts.

Activity: Fiber optic installation, junction boxes, camera foundations.

Free News Delivery by Email

Would you like to have the day's news stories delivered right to your inbox every evening? Enter your email below to start!

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.